Assembly


 

 

 


Pallet Racking Instillation

  1. Stand One Frame up and attach one beam.
  2. Attach second Frame.
  3. Clip in additional beams and ensure safety pins are engaged
  4. Clip in a beam to extend the racking
  5. Add an additional frame
  6. Clip in beam levels where desired
  7. Continue until run is complete
  8. Bolt to Ground with Dyna bolts

    Note: There is only one Dyna bolt needed for each foot For back to back runs with back ties, Dyna bolts are only used around the perimeter of the racking.

 

 